Energy Infrastructure Dail Éireann — 2022-11-08 ============================================================ Paul McAuliffe (FF), Dublin North-West Gabhaim buíochas leis an Aire. I welcome the clarification about the temporary emergency power generation at that location. That will bring the total power generation on the site up to almost 800 MW. I was surprised to hear that 20% of the total generation on the island is generated at the Huntstown plant. There is also a bioenergy anaerobic digestion power station separate to the conventional gas generator. The idea of retrofitting a district heating system to an established generation plant is, of course, complex but these large projects have a community benefit. If we could provide a district heating system connected with the various different activities at Huntstown it would provide a significant benefit to the surrounding community. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2022-11-08/debate/main Retrieved: 2026-08-14T04:51:15+00:00 Sitting date: 2022-11-08