Hospital Facilities Dail Éireann — 2026-02-18 ============================================================ John Connolly (FF), Galway West The first thing I should have said is that I appreciate the Minister of State being here as a Minister of State in the Department of Health to take this question and provide an answer. However we present this, it is a significant change in what was to be the provision of a facility that had intended at its outset and up to 2025 to provide for 200 beds. I recognise fully the point she made that these are day procedures but I understand from the documentation that had been provided previously that there were to be 75 elective inpatient beds and 125 day case beds. That had been the position up to March 2025, when I had previously asked for an update. I was advised that the integrated design team was working at pace to progress the detailed design to inform planning submissions on a range of statutory and regulatory approvals to proceed to tender and construction. That was for the elective hospital. It had been perceived to be the development of a 200-bed facility. I understand some of those were only for day case beds. In terms of my reference to there being two theatres on top of the surgical hub, the information that I received from the HSE describes that the elective care centre will consist of two operating theatres plus four operating theatres in the surgical hub. We were always conscious and always felt that there were two developments here, namely, a surgical hub and an elective hospital. I want to reiterate that the development of the elective hospital was seen as something that could facilitate the increased development at the regional hospital site of the university hospital site. As far as I understood it, the plan had always been that elective non-emergency, non-acute outpatient facilities would all move to the Merlin Park site and that the university hospital site would be for acute, high-tech procedures, cancer care, maternity and accident and emergency. I am really concerned about that plan now. I am really concerned about the progression of that plan. We need clarity on that. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2026-02-18/debate/main Retrieved: 2026-08-14T04:54:39+00:00 Sitting date: 2026-02-18