Renewable Energy Generation Dail Éireann — 2026-04-28 ============================================================ Micheál Martin (FF), Cork South-Central We are rolling it out. We have a plan. That plan has been published, but, let us be honest, it has met roadblocks from all Opposition Deputies. Politically, these are difficult issues. Onshore wind is a difficult issue, but we are all saying that we have to replace fossil fuels. There are tough political choices to be made, but there is a plan for that. We will continue to work on it. Deputy Joanna Byrne mentioned the Celtic interconnector. Overall, it is a good story. I can recall signing the contract some years back. I met Eirgrid officials informally at an event in the French embassy and they indicated that there were technical issues. I will ask Eirgrid to brief the House fully in respect of the matter. My understanding was that it would be finished next year. At the time that I met the officials, about three or four weeks ago, at the French Film Festival in Cork, which Eirgrid sponsored----- --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2026-04-28/debate/main Retrieved: 2026-08-14T04:54:52+00:00 Sitting date: 2026-04-28