Hospital Overcrowding Dail Éireann — 2026-05-12 ============================================================ Maurice Quinlivan (SF), Limerick City The medical board at University Hospital Limerick has, as the Minister of State is aware, warned that the risks to patient care at the hospital remain intolerable and unacceptable. I have spoken countless times in this Chamber over the past decade of the challenges faced by patients and staff at University Hospital Limerick, UHL, and I welcome the intervention of Prof. Devlin of the UHL medical board. Dr. Alan Watts, a consultant in emergency medicine and a member of the board as well, said on the Live 95 FM radio station in Limerick, "There are people on a trolley in the emergency department who should not be there." He said that they should be in a bed and that corridor care is not adequate healthcare. Today, there were 101 people being treated on trolleys and in hospital corridors at UHL. This strips them of their privacy and dignity, yet despite this and despite UHL consistently having the highest number of patients on trolleys in the State, there seems to be no immediate actions being taken to address this crisis. Those who read about the trolley crisis may believe that it only pertains to those in the emergency department. It does not. A walk through the hospital's zones is a walk past numerous trolleys scattered across wards. I have seen this myself. Professor Devlin also has stated that "there are trolleys in corridors all around the hospital". This is a crisis, and it requires a crisis intervention. I am sure the Minister of State will talk about some of the investments and additions that have been made in the last number of years at UHL and the wider mid-west region. There are commitments to open additional beds in Ennis, St John's Hospital and in Nenagh hospital by 2030 or 2031 but we need immediate intervention to tackle the ongoing risk to patient safety caused by the overcrowding at UHL. Put simply, recent Governments have failed to curb the crisis in healthcare at University Hospital Limerick. The new bed unit opened in October last year. While very welcome, it has only reduced the numbers being treated on trolleys by approximately 2%. While any reduction is welcome, this leaves on average 94 people on trolleys every single day in UHL to date this year. The new surgical hubs that could alleviate some of the pressure at UHL will now open at the end of the year and not this month as originally planned. Not only that but the HSE has advised me that it will receive only 50% of the funding needed and that level of funding will struggle to achieve half of the planned 20,000 annual procedures. Will the Minister of State intervene in this issue and speak directly to the Minister, Deputy Carroll MacNeill to make sure that we get the 100% funding that we need? I have been advised by staff and patients at UHL that the MRI machines are often not working, which leaves patients taking up beds for longer than is necessary as they wait for their slot for MRIs that work. It is really appalling that in a modern hospital already plagued with overcrowding that such necessary equipment is often broken. The next additional 96-bed unit at UHL is scheduled to open at the end of 2029. It was announced years ago and yet there has been no urgency to swiftly progress it. UHL is not receiving the support that it needs. For instance, if we compare UHL with University Hospital Waterford, despite UHL having double the number of people presenting at the emergency department, University Hospital Waterford has more consultants than UHL. This is a clear demonstration of years of underfunding for the mid-west region. We have a commitment from the Minister that the three recommendations in the HIQA report will be implemented and yet no board of management has been established to deliver this commitment. The HIQA report, which was published on 30 September 2025, stated the mid-west needs 500 acute additional beds. Some 224 days later, the delays in progressing these recommendations is systematic of the lack of urgency, as usual, where UHL is concerned. A project board needs to be established swiftly to deliver these projects. The challenges at UHL stem from bad decisions taken in the 2000s that ignored the concerns raised at the time about capacity. The board at UHL has called for a suspension of staff ceilings and other staffing restrictions in the mid-west. This call needs the Minister of State's support, and we need to ensure that all resources requested are made available to contribute to the ending of the disgraceful situation at UHL. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2026-05-12/debate/main Retrieved: 2026-08-27T06:54:49+00:00 Sitting date: 2026-05-12