Water Services Dail Éireann — 2026-06-18 ============================================================ Michael Moynihan (FF), Cork North-West I thank the Deputy for raising this important issue. I am answering the issue on behalf of the Minister, James Browne, who sends his apologies as he cannot be here. As the Deputy knows, Uisce Éireann has statutory responsibility for all aspects of water services and planning. Neither I nor the Minister have operational functions in respect of the matter. However, we have made inquiries with Uisce Éireann and have been informed that it is committed to solving and replacing the necessary section of the Maynooth-Leixlip mains water network and has a project in place to do so. Design challenges have arisen in the context of reinforcing the existing pipe and routing a replacement, all while maintaining the required capacity to meet demand on the network. Solutions are being investigated. In the interim, immediate steps have been taken to respond to bursts in the area and to manage supply interruptions as quickly as possible, such as ramping up out-of-hours repair crews and gearing up local stores to ensure urgent availability of materials required. Uisce Éireann is also working with businesses in the area to encourage and ensure on-site storage is in place to limit supply interruptions. Uisce Éireann acknowledges that a long-term solution is required. It is in the process of designing one. In County Kildare, there is a proposed investment of over €170 million in capital projects including the Celbridge and Maynooth leakage reduction programmes and Crodaun wastewater network upgrade that will address some of the most urgent infrastructure deficits, meet environmental obligations and support capacity for housing. It is important to note that Uisce Éireann is dealing with a legacy of underinvestment in water services and infrastructure across Ireland. The scale of the remedial work necessary in our water and wastewater systems will take a number of years and investment cycles to resolve. Uisce Éireann has delivered significant improvements in the provision of water services. Hundreds of water and wastewater treatment plants have been upgraded, thousands of kilometres of new or rehabilitated water mains have been installed, the national leakage rate has been reduced and the overall quality of drinking water remains very high. As part of its future investment plans, Uisce Éireann has brought together the water for growth programme, which is a comprehensive view of water supply and resilience projects in the eastern region, including parts of Kildare. This programme includes some 30 water projects at an estimated investment of €500 million in treatment plant upgrades, new trunk mains and strategic reservoirs to strengthen supply and support growth across the region. I know this is a matter in respect of which Deputy Neville has been advocating for some time, but Uisce Éireann is engaging in respect of some of the fundamental issues. I accept that more work needs to be done. Uisce Éireann assures us that it is meeting the many challenges that exist in the area to which the Deputy referred head-on as best it can. I will refer to that aspect in my closing remarks. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2026-06-18/debate/main Retrieved: 2026-08-27T06:54:51+00:00 Sitting date: 2026-06-18