Water Supply Dail Éireann — 2026-06-18 ============================================================ Michael Moynihan (FF), Cork North-West I thank the Deputy. Three out of five of the Topical Issues have been about Irish Water. I know the Deputy has been talking about Courtbrack and other communities in his constituency for quite some time. In the correspondence we had in the past half hour or so, it covered three constituencies in Kildare, Dublin and Cork, so we can see the frustration of Members about Irish Water, the challenges that are being faced and how we will overcome them. Fundamentally, the availability of water and wastewater treatment plants is one of the most important resources we have to be able to develop further into the future. Over many decades, we have seen as a country the challenges with economic prosperity, but this is one of the key things. I am deviating from the question I was asked but I see the frustration of Members here today and the frustration of Members from across the country. I could turn back and talk about a number of communities I represent and the frustrations I have with it. Irish Water is the statutory body. It has taken charge of this plant. As I understand it, the plant was taken over in January of this year and it was not fit for purpose. It was one of those developer-provided pieces of infrastructure going back a number of years. It is important that we understand the challenges that are there. They are on a boil water notice and the information I have is that, since taking over the operation, Uisce Éireann has been carrying out technical and detailed operational assessments of the plant to determine the works required to ensure a safe and secure water supply to enable the boil water notice to be lifted. Uisce Éireann has now completed the initial scoping work and the first phase of remedial works has now commenced on site. These works are focused on upgrading and improving the existing plant. Uisce Éireann expects to have greater clarity on timelines as these works progress. Once the outcome of this first phase of the remedial works is fully assessed, the impact will inform the need for any subsequent phases of work, if required, which will ultimately guide the approach to resolving the issues at the plant. Given the importance of protecting public health, this process must be thorough and evidence-based. In parallel to these shorter-term improvement works, Uisce Éireann is also progressing the assessment of a longer term rationalisation option. This would provide a more permanent solution but is subject to all necessary planning, environmental and regulatory consenting processes. If the short-term works successfully address the issues at the plant, the need for this longer term project will be reviewed. The boil water notice remains in place and will continue until such time as it is safe to lift, based on the outcomes of the ongoing works. The assessment that Uisce Éireann is doing should be completed in a timely fashion so that we can move forward with confidence that the boil water notice can be lifted. There is a bigger issue with it as well. Even if the short-term issues are resolved, Uisce Éireann should not forget about the long-term issues either. I will relay the Deputy's frustration to both the Department and Uisce Éireann again and ask them to complete the remedial work in as short a timeframe as possible. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2026-06-18/debate/main Retrieved: 2026-08-27T06:54:51+00:00 Sitting date: 2026-06-18