An tOrd Gnó - Order of Business Dail Éireann — 2025-09-23 ============================================================ Colm Burke (FG), Cork North-Central I want to raise with the Minister my concern that there is no structure in place between local authorities and Uisce Éireann. If an engineer in a local authority wants to make a representation about a connection, he or she is treated in the same way as a member of the public. I ask that the Departments would sit down with Irish Water and the local authorities to set up a proper structure. I know of one housing project belonging to a local authority that is now delayed six months because we cannot get the water and sewerage connections as there is such disagreement between them. A structure must be put in place. I ask that this would be done at the earliest possible date. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2025-09-23/debate/main Retrieved: 2026-09-14T01:00:59+00:00 Sitting date: 2025-09-23