Coastal Erosion Dail Éireann — 2026-02-12 ============================================================ Kevin Boxer Moran (IND), Longford-Westmeath I am very familiar with the coastal erosion and flooding issues in Kerry having visited the county twice, on 11 and 12 September and on 20 and 21 November 2025. Localised coastal erosion and flooding issues are a matter, in the first instance, for each local authority to investigate and address. The OPW is working closely with Kerry County Council to implement a number of initiatives to tackle coastal erosion and flooding in the county. We are currently funding three local authority staff in Kerry County Council to manage the delivery of flood relief schemes: a senior executive engineer, an executive engineer and a senior staff member. The minor flood mitigation works and coastal protection scheme was introduced by the Office of Public Works in 2009. The purpose of this scheme is to provide 90% of funding to local authorities to undertake minor flood mitigation works and studies to address localised flooding or coastal erosion problems. The scheme generally applies where a solution can be readily identified and achieved in a short timeframe. The funding available for each scheme has recently been increased from €750,000 to €2 million. Further details related to this are due to be announced shortly. The minor works scheme is a demand-led scheme. Funding allocated is based on the cost submitted by the local authorities for consideration. Since 2009, the OPW has approved some 40 projects and €4.2 million for Kerry County Council under the minor works schemes. Some €2.9 million of this approved funding relates to coastal erosion works and studies. Funding has been made available to Kerry County Council, totalling €897,405, for works or studies at Rossbeigh, Waterville, Kenmare, Glenbeigh and Cromane Lower through the minor works scheme. I have a long list of other schemes that I can give to the Deputy afterwards. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2026-02-12/debate/main Retrieved: 2026-09-14T01:01:02+00:00 Sitting date: 2026-02-12