Schools Building Projects Dail Éireann — 2026-06-09 ============================================================ Conor D. McGuinness (SF), Waterford Táim chun caint anocht faoi Scoil Gharbháin i nDún Garbháin i gContae Phort Láirge. Tá sága - scéal an-fhada - sa scoil seo i dtaobh síneadh a chur leis an bhfoirgneamh scoile. I raise the situation of Scoil Gharbháin in Dungarvan, County Waterford and the long-running saga the school community, the children, teaching staff, management, board and parents have been dealing with over several years. The Department of education has recently communicated the decision to the school that it is to scale back a long-approved nine-room extension. This decision has caused serious concern in the school community because it cuts across what was previously approved, communicated and planned for and what the school has been working towards in good faith over a number of years. In November 2024, after many years of delay and a lot of miscommunication and shifting goalposts, the Department issued a formal offer for a nine-room extension made up of four mainstream classrooms, two special education classrooms and three special education tuition rooms. That offer was made in response to an already recognised accommodation crisis in the school. Today, the school has 13 classes but only nine permanent classrooms, meaning the school cannot operate within its own physical capacity. As a result, children are being taught across a fragmented mix of off-site accommodation, prefab buildings and repurposed spaces that were never designed for long-term use. One of the classes is based off-site in a nearby secondary school. That has been the case for three years. This requires daily movement away from the school campus and results in a loss of normal teaching continuity. The children educated off site also lose out on the community they might otherwise enjoy. Another class has been located in the halla for five years. The entirety of the funds to build that halla were raised by the parents and school community. However, for almost all of that five years, it has served as a classroom. That has removed any kind of proper PE and assembly space from the school. The schoolyard is also taken up with two prefabs, which means there is no outdoor paved area for play on those days when it is not lashing rain. Kids are effectively kept in their classrooms. Those in the prefabs are dealing with damp, deteriorating conditions and structural concerns. The school, which was originally built for 100 pupils, now has 320 and demand is increasing. I should mention that this is a Gaelscoil in Dungarvan. Dungarvan has been recognised as a Gaeltacht service town for a number of years now. Government makes significant investment in promoting the use of Irish as a living community language in the town of Dungarvan. This is the sole Gaelscoil and it is intrinsically important to that project, to the school community, to the children who are educated there and to the promotion of Irish in west Waterford. There is no other Gaelscoil. There is no other option but demand increases. There is a naíonra on site which acts as a feeder for the school. There are waiting lists. Not only is this making teaching very difficult and not only is it impacting the learning experience of the children attending the school but it is also preventing parents from accessing oideachas trí Ghaelainn dá bpáistí, getting an education through the Irish language for their children. Next to the school is a 155-home housing development that is to come on stream in the next year or year and half. That is much needed in Dungarvan. Demand is only going to increase. In the catchment area, there are two English-language schools but both are landlocked and do not have room to expand. I should also mention that, back when I was a councillor, the Department of education funded Waterford City and County Council to buy a site to build an extension for this school. The site is there. It has been paid for with public funds. Approval was granted but the goalposts are now being shifted. To say that the school community feels utterly dejected and let down would be a massive understatement. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2026-06-09/debate/main Retrieved: 2026-09-14T01:01:05+00:00 Sitting date: 2026-06-09