Public Expenditure Policy Dail Éireann — 2026-07-07 ============================================================ Joe Neville (FG), Kildare North I thank the Minister for his response and clarity. Since he has come into his role, he has been very strong in pushing for the need to speed up infrastructure. Through successful economic handling of the State, we have money to spend, which is the most important thing. Of course, we have to spend it wisely and ensure we have infrastructure. I am Leas-Chathaoirleach of the infrastructure committee, which has MetroLink before it tomorrow, the exact type of project the Minister might have in mind. I do not want to pre-empt anything. At the same time, that is the key sort of project we need, along with a DART+ West. My colleague to my left would love to have the same facility in DART+ South West. The population of the State has grown quite rapidly and we need to build critical infrastructure. I look forward to areas being designated and accountability and transparency for projects. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2026-07-07/debate/main Retrieved: 2026-09-14T01:01:07+00:00 Sitting date: 2026-07-07