Regeneration Projects Dail Éireann — 2026-05-19 ============================================================ James Browne (FF), Wexford There is a pathway to resolving this issue. We do need an appropriate mix. The position is not to say that there can be no amalgamation or even a reasonable amalgamation. The Bridgefoot Street development part is essential for the residents of Oliver Bond House as well, and that is a part that can be quite accelerated. There is an element where too much of this is happening sequentially. I am very struck by the fact that the actual process here started five years ago now. Whatever decision was made and whoever made it, and I do not want to go into the history of why we are here, it should not have taken five years to get to this point. We also addressed other issues. There are some important ongoing works that I would call far more than maintenance. Water is dripping through roofs and there is mould. That work should not be put on hold either while the regeneration is happening. There is probably a sense that some works that need to be happening are not happening in the interim either to ensure that people can, at least, address some of those issues. These are ongoing maintenance problems, although far more than maintenance. --- Source: Houses of the Oireachtas. Licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). The Official Report is revised after first publication; the fetch timestamp below identifies the version quoted. Record URI: https://data.oireachtas.ie/akn/ie/debateRecord/dail/2026-05-19/debate/main Retrieved: 2026-09-28T05:50:46+00:00 Sitting date: 2026-05-19