The issue that I am raising relates to back yard dwellings and the new regulations that were announced over the summer. Regarding the regulations, back yard dwellings may work in a certain number of limited cases. I am not going to come in here and knock them, but it is only a certain limited number. There are already issues arising regarding the size of a dwelling, with the main one being that they are counted as class 3A buildings. One is allowed to build 45 sq. m, but if there is an existing small garden shed, garage, greenhouse, small store and so on, they are all counted within the 45 sq. m. However, the dwelling cannot be below 32 sq. m. A dwelling of 45 sq. m gives enough space for one or two people but 32 sq. m would be very small. If someone wanted to built one at 38 sq. m, the fact they had a small shed already would rule that out. If there is a small shed of 14 sq. m, for example, on the site, which would be a very small garden shed like one would have in Leitrim, Sligo, Laois or wherever, one cannot meet the minimum size of 32 sq. m. The way the regulations are framed, it is not possible to have a dwelling and a shed, greenhouse or store. I would say there are none going through in the Minister of State's county. There are certainly none going through in Laois at the moment.
This is regardless of the size of the back garden, yard or site. I am dealing with a case where the owner has a site comprising 1.4 acres. In fact, it is nearly a field. It is a huge site. However, there is already a 15 sq. m small fuel shed on it. The fact that there is a 15 sq. m small shed on it means that the owner cannot put in a modular dwelling for an elderly relative on that site. Does the Minister of State get what I am saying to him? If we take the 15 sq. m from the 45 sq m., that leaves 30 sq. m, so they cannot put anything into it. I am dealing with another case where the owner has 0.6 acre - almost two thirds of an acre - but there is a garage on the site. It is a single-car garage, as is common in almost every rural dwelling around the country. That cannot be done there. I estimate that for 80% of homes and premises in the likes of Laois or most mixed counties where there are towns and rural areas, it will not work. It will be the shed or the dwelling.
A number of other issues arise, such as where there are existing entrances onto regional and national secondary roads. What happens where a house has been given planning permission in previous years and there is an entrance onto a national secondary route or a regional road? There is the issue of water running off roofs. This is going to be an issue where there are neighbouring dwellings. There is the distance from the next-door neighbour. This will become an issue in more urban areas. I live in a housing estate, for example. If there was a modular building put in the garden each side of me at 0.6 metres from the house, that is two ft from my house.
That will become an issue and needs to be revisited. This is the key issue. There is no inspection by the local authority. There is simply a requirement to notify the local authority with a minimum of 14 day's notice. The memo from the Department to the local councils states that this provides the basis for each planning authority to report to the Minister for housing on a regular basis about the uptake of the measure. That is what it is for. It is only to report to the Minister how many has been done, but there is no site assessment or nothing is being done with these. There are a number issues there that need to be sorted out.