Road Projects

4 contributions · 2 speakers · 1,314 words

Download this debate (.txt)

Summary of this debate

Auto-generated

There was some surprise and disappointment that there was no allocation of funding for the continuation of the planning for an upgrade of the road between Maam Cross and Clifden. This is not a new road; this would be a realignment of the existing road to improve safety for all road users and to bring it to a level similar to that which was achieved between Bunnakill and Maam Cross. I am familiar with this road from Clifden to Maam Cross as well.

Is that the Clifden to Maam Cross section or the Maam Cross to Bunakill section? The project was originally part of the N59 Clifden to Maam Cross to Oughterard scheme, which was subsequently taken through statutory process as two separate schemes, Clifden to Maam Cross and Maam Cross to Oughterard.

Built by scoring every sentence in the debate on how distinctive its language is, then quoting the highest-scoring ones back word for word and in the order spoken. Nothing is paraphrased or invented — if a sentence appears here, it was said in the chamber. Drawn from 1,314 words across 4 contributions by 2 speakers.

Most used terms in this debate

How often each word appears across the whole debate, ranked by how distinctive it is to it rather than common to all parliamentary language.

maam 13
clifden 9
cross 13
road 18
oughterard 5
funding 16
preparatory 5
ndp 6
project 10
connemara 4
improvement 6
realignment 3

The full debate

All 4 contributions, start to finish, in the order they were made.

FG Seán Kyne

I welcome the Minister of State, Deputy Feighan. I would like to thank the Cathaoirleach's office for choosing this Commencement matter. I know the Minister of State is familiar with Connemara and the N59. I am sure he has driven it on numerous occasions going out to Clifden or elsewhere in Connemara. Over the past couple of years we have seen huge improvement on that road. First of all, on the surface and, secondly, on some realignment of the sections between Bunnakill and Maam Cross, which started in late 2019 and was complete last year. That is a very welcome development for a road that had a very low level of overtaking opportunities. There has been a huge improvement on that section of road.

There is also work at the moment on the Maigh Cuilinn bypass, and again, that is very welcome. Some €23 million has been allocated this year for that bypass which will benefit Maigh Cuilinn but also all areas past that, such as Rosscahill, Oughterard, Recess and beyond. I welcome the allocation of funding for the N59 from Transport Infrastructure Ireland, TFI.

There is also funding for continuation of purchase of land between Maam Cross and Oughterard. There is some €700,000 allocated this year. There was some surprise and disappointment that there was no allocation of funding for the continuation of the planning for an upgrade of the road between Maam Cross and Clifden. This is an existing road; this is a realignment. This is not a new road; this would be a realignment of the existing road to improve safety for all road users and to bring it to a level similar to that which was achieved between Bunnakill and Maam Cross. However, TFI has not allocated funding and it has stated to the county council that is because of the structuring of the national development plan, NDP, which puts an emphasis on other transport projects in the first five years and allocates the majority of funding for new road projects between 2026 and 2030. This is having an impact on the preparatory work. There are issues in the Minister of State's own area, between Mullingar and Longford, and the road towards Sligo-Leitrim as well.

As the Minister of State knows, it takes a long number of years to get to a stage where diggers and machinery can be moved in to build a road. There is a lot of preparatory work required. Certainly, in an area that is as environmentally sensitive as Connemara, it takes even longer in terms of the number of environmental reports and necessary appropriate assessments and the like that are required. The council acknowledged that.

That is why they need a sufficiently long period of time to allow for the preparation of the planning application and all the reports that are necessary to bring that road project forward.

The director of services in Galway County Council has said to me that, with the best will in the world and if money was not an issue, it would still be five or six years before machinery could roll in and carry out improvement works between Clifden and Maam Cross. However, now Transport Infrastructure Ireland is not providing money to allow that preparatory work to take place, so when the money becomes available, it will have to start again from scratch and do all the environmental reports and everything else that is necessary, and that will take four, five or six years. It is not proper planning nor forward thinking on a project that people assumed would go ahead, would be a continuation of the improvement works that have taken place, and would be beneficial to the residents in Connemara and visitors alike.

FG Frankie Feighan

I thank Senator Kyne for raising this important issue. Approximately €616 million of Exchequer capital funds has been provided for national roads through Transport Infrastructure Ireland, TII, to local authorities in 2022. The 2022 funding allocations are made having regard to the National Development Plan 2021-2030, which balances investment in transport against other priorities of Government, such as housing and health over the lifetime of the national development plan, NDP.

Exchequer funding under the NDP will facilitate continued protection and renewal of our national roads infrastructure, including motorways, and will allow for the development of a number of new road projects in line with Government policy. Approximately €5.1 billion of Exchequer funds is earmarked for new national road projects across the lifetime of the NDP. This funding will, among various objectives, contribute to the achievement of two key national strategic outcomes under the national planning framework, namely, enhanced regional accessibility and compact growth. The greater part of this funding will become available in the latter half of the plan. Some €4 billion will come on stream in the second half of the decade, with €1.1 billion earmarked for the period 2021 to 2025.

Indeed, Senator Kyne outlined the Moycullen bypass. It is a great piece of infrastructure. I am familiar with this road from Clifden to Maam Cross as well. I hope these roads can be enhanced and improved upon and will get the attention they so desperately need. Discussion is ongoing.

FG Seán Kyne

I thank the Minister of State, Deputy Feighan, for the reply. He states on behalf of the Minister, Deputy Ryan, that it is expected the report will be with the Minister for review and a decision this year on whether the project will move to the next stage, and also while this project is not being progressed in 2022, it will be considered for advancement next year. I am confused. Is that the Clifden to Maam Cross section or the Maam Cross to Bunakill section? Perhaps we can get clarity on that.

What is needed here is funding to allow this project to be kept alive, to be progressed and to be ready when funding is available. If funding is to be available, as reported, in 2025 or 2026 we will not be ready at that stage unless we have the preparatory funding to get it ready. That is the crux of the issue. It is agreed the project is beneficial, worthwhile and would be a substantial improvement, but we need the preparatory funding to get it to the stage where, when the big money necessary is available, we will be ready to roll. I ask the Minister of State to liaise with the Minister, Deputy Ryan, to ensure that can be kept under review and funding can be provided to keep this project alive and moving.

FG Frankie Feighan

I thank the Senator. As I mentioned previously, the N59 Clifden to Maam Cross improvement project remains on the list of projects included in the NDP. While funding has not been provided to progress planning and design of the scheme within the current year, subsequent phases will be progressed later in the plan. However, I agree with the Senator that these things should be kept alive. I will bring the Senator's views to the attention of the Minister. The project was originally part of the N59 Clifden to Maam Cross to Oughterard scheme, which was subsequently taken through statutory process as two separate schemes, Clifden to Maam Cross and Maam Cross to Oughterard.

The project, as part of the overall N59 Clifden to Maam Cross to Oughterard scheme, will provide 45 km of improved road and 12 km of greenway infrastructure, providing linkages to other sections of existing and proposed greenway, which will boost the tourism industry regionally, as set out as a national strategic outcome in the NDP. One thing for which we should all be thankful is the fact we are putting in more greenways along with these sections of improved road, but 45 km of improved road is desperately needed in an ever-growing area and an area of beautiful scenery as well. I hope this will be progressed as quickly as possible.