I move: That the Bill be referred to the Select Committee on Transport pursuant to Standing Orders 103 and 188.
On prevailing side: this member voted with the winning side in 1,046 of 1,054 decisive votes (4 abstentions excluded). Read it as a government-or-opposition indicator rather than a measure of influence — the figure is near 100% for members supporting the government of the day and near 0% for those opposing it.
This is the point of the site: contributions keep the party held on the day, not the one held now.
| Party | Recorded as | Contributions | Period |
|---|---|---|---|
| FF | Fianna Fáil | 3,409 | 2020-03-26 – 2026-09-17 |
Membership spells on record: FF 2007-05-24–2011-02-01 · FF 2011-03-04–2011-04-25 · FF 2011-05-25–2016-04-24 · FF 2016-03-10–2020-01-14 · FF 2020-02-08–2024-11-08 · FF 2024-11-29–present
I move: That the Bill be referred to the Select Committee on Transport pursuant to Standing Orders 103 and 188.
Sustained investment in the public service obligation, PSO, programme has driven record public transport use, with passenger numbers up 23% and continuing to grow this year, alongside an expanded network serving over 240 towns and villages. As demand rises and congestion issues remain, Ireland’s public transport system has reached a pivotal point, with an increasing need for reliable services. A fundamental reset in funding was required to place the PSO programme on a sustainable, long-term footing in line with the…
The 6.50 a.m. service is not going. Let us be clear on that. I know that the Deputy has been running a bit of a campaign locally. The 6.50 a.m. train service will be retained; end of story. What I was trying to explain in my answer was that we got a big uplift in PSO funding. For the past five years in the Department of Transport, a big supplementary budget was requested at the end of the year to basically backfill new services. I did not want to do it that way, which is why we got a big uplift - a 42% increase - i…
I have spoken on the record of the House about the 6.50 a.m. train. The Deputy has raised it. Deputy Albert Dolan has raised it with me as well. That service is being retained, and I will relay that information. I am not sure how it got to the stage where there was uncertainty around it. The broader point, which I have explained, is that about €1.6 billion is the operational cost of our public transport network across the board, most of that being PSO and fares. That is what it costs to run what we have, which is a…
I thank the Deputy for raising this issue again. I know there is a campaign on the ground supported by her. This is an important service that we want to get into use. I mentioned in my previous answer that this year has been a year to ensure that we got an increase in the PSO funding, which is very significant. There has been considerable investment in services throughout the country under the Connecting Ireland Rural Mobility Plan. I think everyone is agreed that has been a real success. I have met many of the Loc…
I have outlined that this is an important service for people. I have outlined what has been done in just the past two years in relation to Local Link services in Wicklow. I think everyone acknowledges that there has been a significant increase. This route, this service, is a priority. I want to see it in place as soon as we can. I am trying to give a realistic timeframe for its implementation because the Deputy is right that people need certainty around it. They do not need to be told it might be next week and next…
I know people have been told this is funded. I know that the bus is purchased. People have been employed. If we can get it started earlier, we will do so. I will go back and specifically ask why that was advised previously. What the Minister of State, Deputy Buttimer, and I have tried to do - and I think we have done it pretty well - is to get that big uplift so we are starting from a higher base and then we can really be sustainable. As to what happened over the past five years, it was great to see the increases i…
-----because it was just a matter of going in every year for additional moneys towards the end of the year. I will specifically and personally check this one out and I will revert to the Deputy. I am trying to give a realistic timeline and, in fairness, she has accepted that. If it can be done sooner, we will do it sooner because I know the bus has been purchased. Let us see what we can do in that regard and I will come back to the Deputy directly.
The National Train Control Centre building was completed in November 2022, on time and within budget, despite significant disruption to the construction sector throughout the Covid pandemic. While the building today houses some signalling operations and Iarnród Éireann staff, as well as approximately 100 personnel of An Garda Síochána overseeing communications in the Dublin metropolitan region, bringing the centre into full operation has been delayed by slower-than-projected progress in developing and rolling out t…
It is a very important system. We need this system in place. It is not a question of just pulling the plug on it. It has to be managed through. I have said very clearly to Indra myself that I am most unhappy with the manner in which this is being delivered and the delays in the system. In relation to the write-down amount, I note that the asset value of the national train control centre, NTCC, is also considered in the CIÉ Group accounts for 2025. These accounts were received by my Department on 18 May and are curr…
We are on track to deliver contactless payments. I have met Indra specifically about the contactless payments. That is critical for the public transport offering that we have across the country. Real-time testing rolls out on a phased basis next year, leading to a phased roll-out from 2028. That is a very intricate system. It has to operate in tandem with Leap as well, so we have to operate dual systems. On this specifically, I want to be clear that from a rail safety perspective, contingency plans are in place to …
We are about to start MetroLink out in Dublin north. MetroLink to the south west would be another transformational project. I welcome the Deputy’s question on this. If we want people choosing public transport instead of cars, which they are in many areas whether for cost, congestion or climate reasons, we need to provide an integrated transport network that lets people travel throughout the city. It is for this reason that we do not try to bring forward rail lines or routes in isolation but use the Greater Dublin A…
It is a very good point. This year has been really significant in the delivery of metro. We have our full railway order and clean planning permission. It is out to tender and some of the enabling works have started already in the Swords area, with the realignment of the roads, and construction is to start next year. On a MetroLink to Dublin South-West, I fully get what the Deputy is saying. This will be a six-to-eight-year build. While that is happening, this review will have been undertaken. MetroLink will be the …
This is a very exciting time for public transport. This five-year period is a delivery period of major projects that people have heard and spoken about, including the expansion of the DART and, as I mentioned, DART+ West, DART+ South-West, DART+ Coastal North, Cork light rail, phase 1 of Cork commuter rail, which is concluding, and the commencement of MetroLink. These are transformational projects that are badly needed. A lot of them will deal with an infrastructural deficit that we have carried for a long number o…
That is what we are hoping to do. I want to again make it clear that the NTA is responsible for the provision, scheduling and timetabling of public transport services nationwide. The Deputy knows that. It works with operators to deliver these services. I mentioned in response to earlier questions that we have secured a significant uplift in PSO funding, a 42% increase. I do not want to get back into supplementary budgets every year to provide services. We need certainty. The N8 route is planned to be implemented as…
To be fair to the Deputy, he has advocated for this. He mentioned he has been asking this question since 2024. The route was planned and approved before I came in as Minister for Transport. Having said that, in this year's budget we were able to secure €1.6 billion to run our public transport network. We have about €960 million in PSO, up 42% on the previous year, which gives us a much higher base. I want to deliver the bus route this year. I have said that before. I do not have an exact date. As is the case with e…
It does come down to money. The Deputy is absolutely right. When I came into the Department of Transport we were very short of money, including PSO funding. Over the term of the previous Government, every year there was a supplementary budget, that is, additional moneys added at the end of every year. We could not plan new services properly. My big focus this year was securing an increase of 43%, up to €940 million. That is a much higher base which means we move into next year with a higher level of funding to prov…
The DART+ programme, including DART+ South West, is a priority investment for me as Minister and for the Department of Transport. Collectively, the programme will triple the length of the electrified Dublin commuter rail network and double its capacity, with customers starting to experience tangible benefits from the middle of next year when services to and from Drogheda come into operation. That is the first iteration of the programme. In terms of DART+ South West specifically, a major milestone was cleared in Nov…
I have not misled the House. I do not do that and the Deputy should withdraw that comment.
This is the first time the Deputy has come into the Chamber for transport questions to even ask about this project. He is feigning an interest in it. Other colleagues across other parties regularly advocate for this. The Deputy does not like good news and he does not like to see any progress on anything because it does not suit-----