I wish to raise with the Minister of State the situation of Cloontagh National School in County Longford. This is a rural DEIS school between Ballymahon and Longford town where the children and the staff are being asked to learn and work in conditions that are simply not acceptable in 2026. I visited this school recently and I was struck by the artwork on the walls, the colour, the kids out in the yard having the craic as all kids should be, and the passion that the teachers and the staff brought. However, that could not and will not hide the reality of the condition of the buildings in which the children are being taught. There is constant damp. There is mould on the walls, the ceilings and even on the floors. Dehumidifiers are running constantly. Equipment and laptops in use by the teachers have been replaced due to moisture damage.
The principal wrote to the Department in November outlining how the school was in crisis mode and had genuine health, safety and well-being risks. A photograph I am showing here from an engineer's report was also sent to the Department. It shows glue sticks black with the mould from being in that classroom. This is simply not good enough from any school, never mind a primary school.
The biggest concern that was outlined to me was the prefab structure that is also on-site. It is decades old and it is clearly failing. That engineer's report from February of this year shows visible deterioration of the external walls, mould growth inside the toilet area, water ingress through the ceiling, and even lifting floors and peeling walls inside the teaching space. The accommodation itself in the prefab is a small lobby, a toilet and a classroom and the only way I can describe the floor in certain areas of that prefab is that it is squishy when you walk on it. No prefab floor should be squishy when you walk on it but that is exactly what is happening. There is also significant and concerning signs of structural instability in that prefab and that is the reality for those kids today.
The principal wrote to the Department last year describing persistent damp mould, maggots and flies appearing inside the classroom, heating that cannot keep the building warm and the damage to the ICT equipment because of the moisture level, clearly stating how the school was in crisis mode and that the building is no longer fit for purpose. She is not exaggerating. She is pleading for help because this school was already approved for a new building in 2022. The agreed designs were of the Department's standards and were well above what the school itself had originally asked for. Land has been purchased, designs prepared, engineers paid and plans drawn up but today those children are still in that same prefab and the building is simply not fit for purpose.
I asked a parliamentary question as to where this school was on the timeline for additional school accommodation and I was told that no timeline can be given for when construction will begin. That answer may satisfy a file but it certainly does not satisfy the parents and the staff nor does it meet the needs of the children who have to sit in that school every day. This is not a luxury project by any stretch. This is not a wish list. This is a basic requirement for a safe, dry and modern school building.
Cloontagh National School may be a small school but the children who attend that school deserve the same standard of facilities as any child anywhere else in the State. Will the Department recognise that this case is urgent? Will it be prioritised? When will the project move to construction and, in the interim, will a full health and safety audit be carried out on the exiting facilities? This current situation cannot continue.